Kawana Master Drainage Study

Sunshine Coast Council

Back

Master Drainage Study for the Kawana catchment, extending from Point Cartwright to Moffat Beach.

The Project

Master Drainage Study for the Kawana catchment, extending from Point Cartwright to Moffat Beach

Our Task

The scope of works included defining the existing stormwater network in conjunction with developing a rain on grid TUFLOW model to determine the overland flow/flooding characteristics within the catchment. Future (ultimate) land-use conditions were also considered.

Project delivery included:

  • development of a concept design of mitigation measures;
  • staging program; and
  • cost estimate A mitigation solution for each catchment (and flow path) was developed based on ultimate land-use identified within the planning scheme.

Mitigations measures were devised (which were largely increase in pit and pipe capacity) to ensure overland flow and flooding outcomes achieved compliance with QUDM and planning scheme.

1,992 ha Catchment

Developed a “rain on grid” TUFLOW Model

Analysis of 8 development and climate scenarios

Identified 44 mitigation options

Read more

Civil Engineering

Brisbane Recycling Park

Preparation of a Flood and Stormwater Management Plan for the proposed Wanless Recycling Park at Willowbank.

Get in touch

To get in touch with our team, click through to be taken to our online form.

Contact us

General Enquiries

Brisbane

Level 4
196 Wharf Street
Spring Hill, QLD, 4000

07 3532 1300

Email us

Sunshine Coast

Level 2
1 Innovation Parkway
Birtinya QLD 4575

07 5413 5300

Email us

Melbourne

Level 1
1-5 Nantilla Road
Notting Hill VIC 3168

03 9562 7424

Email us